Environmental assessment
Underwater Noise Studies
Assessment of the underwater noise impact of port, offshore, cable-laying, dredging or pile-driving works, with a report ready for the SEIA.

Who it is for
Ports, offshore, submarine cables, dredging or pile driving: any activity that could affect marine wildlife.
Regulations
Chile has no underwater noise standard. It is assessed under Article 11 of Law No. 19,300, using international thresholds for each wildlife group.
What you receive
Technical underwater noise impact report, ready for the SEIA.
Tell us the activity and the project area: that is what we need to scope the study.
Request a quote for this studyHow we work
- 1Source characterization
We identify the source: pile driving, blasting, dredging or other.
- 2Propagation modeling
We estimate how noise propagates underwater in the project area.
- 3Comparison with thresholds
We compare levels against international reference thresholds.
- 4Mitigation
We recommend mitigation measures where needed.
Head of this service line

Fernando Salinas
Project Manager, Acústica Austral
We sign every study on behalf of the Acústica Austral team.
What the price depends on
There is no fixed price: it depends on 4 factors.
With the activity, the area and the deadline, we send you a technical proposal within 1 to 5 working days.
Frequently asked questions
Is there a Chilean underwater noise standard?
No. There is currently no specific national standard; the assessment is carried out under Article 11 of Law No. 19,300, using internationally recognized reference thresholds based on the marine wildlife group affected (cetaceans, pinnipeds, etc.).
Which activities carry the greatest underwater noise risk?
Pile driving and underwater blasting tend to be the highest-emission sources of underwater noise, followed by dredging.
How is underwater noise measured?
With calibrated hydrophones at different points and depths, according to the methodology defined for each project. We always carry out continuous underwater noise measurements.
Request a quote
- Technical proposal
- We reply within 1 business day. Technical proposal within 1 to 5 business days, depending on the complexity of the request.
- Delivery time
- 12 to 16 weeks from the start of baseline measurement, depending on project complexity.

Talk to our Head of Engineering about how we can help
Nicolás Bastián MonarcaHead of Engineering · Acoustic Civil Engineer · MSc in Acoustics and Vibration+56 9 4490 0353[email protected]Free resources for your project
Guide to the D.S. N°14/2024 and the acoustic checklist for entering the SEIA, in PDF. We email them to you.
Get both resourcesQuick quote
Get a quote for this study in one minute
With these details we prepare the technical proposal for this study.
- We reply within 1 business day
- Technical proposal in 1 to 5 business days
- Study in 12 to 16 weeks from the baseline
We only use your details to reply to you. Privacy policy.
