Wind farms
Wind Farm Noise and Shadow Flicker Studies for the SEIA
Noise and shadow flicker prediction for wind farms, with noise contour maps and shadow-hour maps per receptor, ready for the environmental assessment file.

Who it is for
Owners and developers of wind farms, whether in environmental assessment or already in operation.
Applicable regulations
Noise: MMA and SEA guideline for applying D.S. No. 38/11 to wind farms. Shadow flicker: there is no Chilean standard; it is assessed under Article 11 of Law No. 19,300, using international references (for example, the German guidelines on shadow hours).
What you receive
Noise and shadow flicker report with noise contour maps and shadow hours per receptor, ready for the environmental file.
Tell us the location and preliminary layout of the wind farm: we will tell you what information we need.
Get a quoteHow we work
- 1Noise modeling
We model how turbine noise propagates.
- 2Shadow flicker
We estimate shadow hours at each receptor, based on turbine location, height and orientation.
- 3Comparison with criteria
We compare both results against the regulatory criteria.
Head of this service line

Nicolás Bastián
Director of Engineering, Acústica Austral
We sign every study on behalf of the Acústica Austral team.
Related projects
Frequently asked questions
Are noise and shadow flicker assessed together, or are they separate studies?
While both studies (noise and shadow flicker) depend on the location and operation of the wind turbines, they are separate studies since they involve different types of impact.
What happens if there’s no Chilean standard for shadow flicker?
Since no specific national standard exists, we assess the risk under Article 11 of Law No. 19,300, using international guidelines (such as the German standard) on permissible shadow hours as technical reference.
Does the study apply to both environmental assessment and operation?
Yes, it applies both for SEIA submission and for verifying compliance of a wind farm already in operation.
What project data do you need for the study?
Turbine location and technical specifications, and the location of nearby sensitive receptors.
And if the study concludes that mitigation is needed?
The report ends by defining how much attenuation is needed, at which point and in which frequency band. We carry on from there: we specify the solution and, if it suits you, we supply the equipment.
What the price of your study depends on
There is no fixed price: it depends on 5 factors.
With the location, the layout, the turbine datasheet and the deadline, we send you a technical proposal within 1 to 5 working days.
Further reading: Wind farm noise and shadow flicker.
Request a quote
- Technical proposal
- We reply within 1 business day. Technical proposal within 1 to 5 business days, depending on the complexity of the request.
- Delivery time
- 4 to 16 weeks, depending on whether it is a shadow flicker study (which does not require baseline measurement) or a wind farm noise study.

Talk to our Head of Engineering about how we can help
Nicolás Bastián MonarcaHead of Engineering · Acoustic Civil Engineer · MSc in Acoustics and Vibration+56 9 4490 0353[email protected]Free resources for your project
Guide to the D.S. N°14/2024 and the acoustic checklist for entering the SEIA, in PDF. We email them to you.
Get both resourcesQuick quote
Get a quote for this study in one minute
With these details we prepare the technical proposal for this study.
- We reply within 1 business day
- Technical proposal in 1 to 5 business days
- Study in 4 to 16 weeks, depending on the type of study
We only use your details to reply to you. Privacy policy.
