- 900+
- projects completed
- 125
- SEIA-approved projects
- 50+
- wind farm projects completed
- 18
- government projects completed
- 40+
- scientific publications
Figures as of July 2026 · Since 2010
When you need us
- SEIA submission for a transmission line, a substation or a BESS
- Responding to SEA observations on audible noise (corona effect) or transformer noise
- Noise standard compliance measurements at substations in operation
- Neighbour complaints about transformer hum
- Extensions to existing substations: how the new equipment adds to the current noise
Why lines and substations make noise
On a high-voltage line the main cause is the corona effect: when the electric field at the conductor surface exceeds the dielectric strength of the air, the air ionises and gives off a hum or a crackling sound. With alternating current, rain and high humidity make it worse.
At the substation, the main source is the transformers, with a component at twice the grid frequency (100 Hz in Chile) and its harmonics; cooling fans add broadband noise.
Applicable regulations
- D.S. N°38/11 (MMA), which continues to apply during the transition, and D.S. N°14/2024 (MMA), which explicitly names transmission as part of energy infrastructure. D.S. N°14/2024 applies from 27-08-2027 to projects entering the SEIA after its publication, and from 27-08-2028 to all other stationary sources.
- SEA criterion (2023) for predicting and assessing audible noise from the corona effect in electricity transmission projects.
- SEA guide (2019) for predicting and assessing noise and vibration: where there is a substation, the combined emission of the line and the substation is assessed.
- Article 22 of D.S. N°14/2024 instructs the SMA to issue a dedicated protocol for transmission infrastructure. As of 11-11-2026 we have not found it published.
Further reading: Noise from transmission lines and substations: what the SEIA requires.
A point worth looking at now
In rural areas, D.S. N°14/2024 sets the limit based on rural background noise, and for projects that go through the SEIA that background noise is the one established in the assessment or in the RCA (environmental approval). A well-measured baseline defines the limit the project will operate under.
One more nuance: neither D.S. N°38/11 nor D.S. N°14/2024 corrects for tonality or low frequency. A transformer hum can meet the dB(A) limit and still be clearly audible in a nearby home. It is worth taking into account when siting equipment.
Our services for this sector
- Noise impact studies for the SEIA (baseline, combined modelling of the line and the substation, mitigation if required)
- Noise standard compliance assessment at substations in operation
- Environmental noise control engineering (barriers, enclosures, equipment siting)
- Advice on the transition to D.S. N°14/2024
A project in this sector
Owner: África Solar SpA · Bulnes, Ñuble Region · 2025
BESS Lucero and 66 kV transmission line
DIA · Approved95 MW / 340 MWh362 m, 66 kV line
A battery energy storage system in a rural area of Bulnes, with a 33/66 kV substation and a 362 m, 66 kV line to the Lucero substation. We carried out the noise and vibration studies for the DIA and the responses to the authority’s observations (ICSARA).
At night, background noise at the dwellings was 28 to 35 dBA. With machinery restrictions and noise barriers, the project complies with D.S. No. 38/11 at all receptors and in all phases. RCA No. 20261600131, of 30 June 2026.
Why Acústica Austral
We carry out compliance measurements at high-voltage substations in central and southern Chile, SEIA studies for energy storage systems, and advise transmission companies on the transition to D.S. N°14/2024. A single team of Acoustic Civil Engineers, with no subcontracted stages.
Is your transmission or BESS project entering the SEIA?
Free preliminary diagnosis and technical proposal within 1 to 5 business days. We reply within 1 business day.
Product solutions for this sector
ZeroSound: active noise control with relocatable panels and no civil works. Among its applications, the manufacturer lists substations and battery energy storage systems (BESS). We are its exclusive agents in Chile.
Free resources for your project
Guide to the D.S. N°14/2024 and the acoustic checklist for entering the SEIA, in PDF. We email them to you.

