Sectors

Noise studies for renewable energy projects

Wind farms, solar plants, substations and transmission lines. We developed South America’s first wind-farm noise study for the Ministry of the Environment — the same methodology used to assess wind-turbine noise in Chile today.

Book a 20-minute call →

When you need us

  • Wind farms: noise and shadow flicker
  • Photovoltaic and concentrated solar plants
  • Electrical substations and transmission lines
  • SEIA submission and updates
  • Responding to SEA observations on the acoustic component

Applicable regulations

D.S. N°38/2011 and the new D.S. N°14/2024 — which introduces a dedicated methodology for wind farms (characterization by L90 percentile and continuous monitoring) — along with the SEA guidelines and shadow-flicker assessment.

Our services for this sector

Is your wind farm entering the SEIA in the next two years? See how it’s affected by the new D.S. N°14/2024.

Why Acústica Austral

We work with the country’s leading power generators — Enel, Engie, Colbún, Statkraft, Mainstream, AES and Transelec — and authored the national methodology used to assess wind-turbine noise today. A single team of Acoustic Civil Engineers, with no subcontracted stages.

Get ready before submitting your renewable project to the SEIA

Free preliminary diagnosis and technical proposal within 1 to 5 business days.

Book a 20-minute call

Free resources for your project

Guide to the D.S. N°14/2024 and the acoustic checklist for entering the SEIA, in PDF. We email them to you.

Get both resources