Noise control

Post-installation acoustic verification

We measure the result once the solution is installed, and put in writing whether the acoustic requirement was met.

Sound level meter measuring in front of an acoustic enclosure with louvres, after installation

Where projects get lost

A study defines how much attenuation is needed, at which point and in which frequency band. A supplier delivers equipment with a catalogue attenuation figure. Between those two things there is a gap that almost nobody covers: the actual assembly, the actual operating conditions, leaks through pipe penetrations or poorly executed seals, among others. Correct equipment badly installed does not comply, and the only way to know is to measure.

What it includes

  1. 1Review

    We check the installation against the project’s acoustic specification.

  2. 2Supervision (optional)

    On site, during installation.

  3. 3Measurement

    After commissioning, at the same points and with the same methodology as the original study, so the figures can be compared.

  4. 4Report

    Result per frequency band, compared against the requirement set by the study.

  5. 5Diagnosis if it does not comply

    Where the loss is and what needs fixing.

When it is worth contracting

  • When the RCA or an SEA observation committed a mitigation measure and you need to demonstrate that it was implemented.
  • When the investment in equipment is high and it is worth confirming that it delivered what was specified.
  • When there is a community complaint and technical evidence of the situation after mitigation is needed.
  • When the equipment was supplied by a third party and you want an independent opinion on the result.

What it is not

This is an engineering service, not a measurement with legal validity before the Environment Superintendency (SMA): we are not an authorised environmental inspection entity (ETFA). If your project needs a measurement with that status, we will tell you up front. This service is a preventive measurement, so that you know where your project stands on compliance — because if an ETFA measures and finds an exceedance, your project will be in trouble.

Who does it

The same team that ran the study. All acoustic civil engineers, with no subcontracted stages. If we ran the original study, the comparison is direct, because the measurement points and the methodology are already defined.

Head of this service line

Nicolás Bastián

Nicolás Bastián

Director of Engineering, Acústica Austral

We sign every study on behalf of the Acústica Austral team.

What the price of your verification depends on

There is no fixed price: it depends on 4 factors.

On-site supervisionOptional.
Measurement pointsThe same as in the original study.
DiagnosisIf the requirement is not met.
DeadlineDelivery earlier than the standard timeframe may change the price.

With the original study or the specification, the location and the deadline, we send you a technical proposal within 1 to 5 working days.

Request a quote

Technical proposal
We reply within 1 business day. Technical proposal within 1 to 5 business days, depending on the complexity of the request.
Request a quote for this verificationBook a 20-minute call

Talk to our Head of Engineering about how we can help

Nicolás Bastián MonarcaHead of Engineering · Acoustic Civil Engineer · MSc in Acoustics and Vibration+56 9 4490 0353[email protected]

Free resources for your project

Guide to the D.S. N°14/2024 and the acoustic checklist for entering the SEIA, in PDF. We email them to you.

Get both resources