For the noise standard, a building site is a fixed source, just like an industrial plant. D.S. N°14/2024 (Supreme Decree 14/2024) of the MMA (Ministerio del Medio Ambiente, Ministry of the Environment) says so explicitly: the regulated sources include «faenas constructivas» (construction works), defined as construction, repair, modification, alteration, reconstruction or demolition activities and excavations, among others (arts. 3 and 4(n)). It also treats the vehicles used within the site, such as lorries and machinery, as part of the source (art. 3).

The decree explains why construction works receive special treatment: around 50 % of the complaints received by the SMA (Superintendencia del Medio Ambiente, Environmental Superintendency) concern noise, and housing and real estate construction works are among the most reported sources. This is stated in the recitals of the decree itself.

What does not change: the limits and where they are measured

The limits for urban areas are the same as those set by D.S. N°38/11: 55, 60, 65 and 70 dBA during the day and 45, 45, 50 and 70 dBA at night for zones I, II, III and IV respectively, depending on the zone in which the receptor is located (art. 6). The daytime period runs from 7:00 to 20:59 and the night-time period from 21:00 to 6:59.

The underlying criterion does not change either: compliance is assessed by measuring at the receptor, at the time and under the conditions of greatest noise exposure (art. 15). In practice, this means measuring at the dwelling when the works are at their noisiest stage.

What changes for a construction site

What the decree says about the good practice plan

Article 21 instructs the SMA to issue, within 60 working days of the decree’s publication, general instructions with recommendations for the design of a plan of operating conditions setting out management, control and mitigation measures, for construction works and for nightclubs and pubs.

For night-time venues, the Ministry of the Environment has already published in 2026 the guide «Medidas y recomendaciones para el control y gestión de ruido en locales de ocio nocturno» (Measures and recommendations for noise control and management in night-time leisure venues), with technical support from IDIEM at the Universidad de Chile, available (in Spanish) at ruido.mma.gob.cl. It is a ministry guide, not the SMA instruction required by the decree.

This needs to be read carefully. The decree does not set the content of the plan, nor does it make it mandatory: it asks the SMA for instructions containing recommendations. According to the recitals, the aim is «preventive and timely» control, with measures built in from the design of the source.

As of the date of this article, we have not found that SMA instruction published.

In the meantime, there is a useful reference. In April 2023, the Ministry of the Environment, in collaboration with the Cámara Chilena de la Construcción (Chilean Chamber of Construction), published «Medidas y recomendaciones para el control y gestión de ruido en actividades de construcción» (Measures and recommendations for noise control and management in construction activities), an updated version of the 2022 technical document. It recommends that each site draw up a noise management plan built on five points:

  1. Identify sensitive receptors: homes, healthcare centres, schools, nurseries and care homes for older people.
  2. List the noisy machinery and activities.
  3. Plan the control measures for each source and design the site layout, keeping permanent sources such as cutting, the concrete mixer lorry and material unloading away from receptors.
  4. Keep a formal channel open with the community, before and during the works.
  5. Appoint a team responsible for supervising the measures, the noise levels and the complaints.

It also groups the measures into four types: noise control (barriers, enclosures), requirements for machinery and equipment, construction methods and good practice, with a matrix suggesting which to apply for each activity. It is a voluntary guide and states that following it does not exempt anyone from complying with the emission standard.

Who enforces: the SMA, and municipalities in which cases

Precision matters here, because it is easy to read more into the decree than it says.

In short, for a real estate development, enforcement of the standard remains in the hands of the SMA. The municipality takes part when the SMA brings it in through a sub-programme or agreement. Separately from the decree, each local bylaw may require its own prevention and control measures, and it is worth checking them municipality by municipality.

When it applies

D.S. N°38/11 continues to apply during the transition. D.S. N°14/2024 applies from 27 August 2027 to projects entering the SEIA (Sistema de Evaluación de Impacto Ambiental, Environmental Impact Assessment System) after its publication, and from 27 August 2028 to all other fixed sources, which includes most real estate developments that do not go through the SEIA. We explain this in our article on its entry into force.

The months still to go are no reason to wait. A site that starts in 2027 may still be under way when the new decree comes into force.

What to do now

How we do it

We measure noise from building and hospital construction works in accordance with the standard in force, at the receptor and during the stages of highest emission. Using predictive modelling, we estimate the noise of each stage of the works at the receptors and design the control measures required. More details on our real estate sector page.

Is your project about to start, or has it already received a complaint? Book a 20-minute call: we will carry out a free preliminary assessment and you will receive a free technical proposal within 1 to 5 working days.

Nicolás Bastián Monarca
About the author
Nicolás Bastián Monarca
Head of Engineering · Acoustic Civil Engineer · MSc in Acoustics and Vibration

He leads Acústica Austral’s environmental noise and vibration studies for the SEIA across energy, port and infrastructure projects, and has contributed to reference work for Chile’s Ministry of the Environment.