In urban areas, the noise limit that a fixed source must meet does not depend on the source but on where the receptor is located. D.S. N°14/2024 (Supreme Decree 14/2024) of the MMA (Ministerio del Medio Ambiente, Ministry of the Environment) says so in article 5: noise levels must comply with the limit “corresponding to zone I, II, III, IV or the rural zone in which the receptor is located”. So, before measuring or modelling, one question has to be answered: which zone is each receptor in?

A wrongly assigned zone is not a minor detail. Between zone I and zone IV there is a difference of 15 dBA during the day and 25 dBA at night. The decree itself acknowledges the problem: one of its changes seeks to “reduce incorrect interpretations that lead to a wrong definition of the limit to be met”.

The limits for each zone

The urban limits are the same as those set by D.S. N°38/11 (art. 6):

Zone Daytime (7:00 to 20:59) Night-time (21:00 to 6:59)
I 55 dBA 45 dBA
II 60 dBA 45 dBA
III 65 dBA 50 dBA
IV 70 dBA 70 dBA

What changes is how the zone is determined. D.S. N°14/2024 sets out, one by one, the combinations of land uses that correspond to each zone (art. 7 and tables 2 to 5).

Step 1: the land uses permitted where the receptor is located

The starting point is the IPT (Instrumento de Planificación Territorial, Territorial Planning Instrument) in force at the receptor’s location, that is, the municipal or inter-municipal zoning plan, and the land uses it permits in that zone of the plan. The decree recognises seven uses, as defined in the OGUC (Ordenanza General de Urbanismo y Construcciones, General Ordinance on Urban Planning and Construction) (art. 7):

Article 8 adds four clarifications that change results:

Step 2: the combination of uses defines the zone

With the permitted uses in hand, the combination is looked up in tables 2 to 5 of the decree. The tables are long, but they follow a logic that can be summarised as follows:

This summary is our reading of the tables. For a report, the zone is assigned using the exact combination in the decree’s table.

Step 3: special cases

Article 10 deals with two common situations:

Outside the urban boundary these tables do not apply: the receptor is in a rural zone and its limit depends on rural background noise (arts. 11 to 14). We explain this in our article on rural background noise.

If the zoning plan is unclear

The decree also says whom to ask (art. 9). Where further clarity is needed, the municipal Works Department (Dirección de Obras) or the Seremi de Vivienda y Urbanismo (Regional Ministerial Secretariat for Housing and Urban Development), as appropriate, states the land uses permitted by the IPT at the receptor’s location. In the event of a dispute, the Seremi de Vivienda y Urbanismo interprets the land use.

In practice, it is advisable to keep that enquiry documented in the file. A zone backed by the planning authority is harder to challenge than a zone inferred from a map.

What it means for a study in the SEIA

When it applies

D.S. N°38/11 continues to apply during the transition. D.S. N°14/2024 applies from 27 August 2027 to projects entering the SEIA (Sistema de Evaluación de Impacto Ambiental, Environmental Impact Assessment System) from its publication (27 February 2026), and from 27 August 2028 to all other fixed sources. We explain this in our article on its entry into force.

A project entering the SEIA today may complete its assessment or start operating with the new standard in force. That is why it makes sense to assign zones using the D.S. N°14/2024 criteria from the baseline onwards.

How we do it

In every study we assign the zone of each receptor using the IPT in force and document it in the report, together with the map and the combination of land uses that was applied. If the zone is unclear, we say so and propose how to resolve it before measuring.

Do you have receptors in a mixed-use zone or a zoning plan under amendment? Book a 20-minute call: we will carry out a free preliminary assessment and you will receive a free technical proposal within 1 to 5 working days.

Nicolás Bastián Monarca
About the author
Nicolás Bastián Monarca
Head of Engineering · Acoustic Civil Engineer · MSc in Acoustics and Vibration

He leads Acústica Austral’s environmental noise and vibration studies for the SEIA across energy, port and infrastructure projects, and has contributed to reference work for Chile’s Ministry of the Environment.

Meet the team →

Free resources for your project

Guide to the D.S. N°14/2024 and the acoustic checklist for entering the SEIA, in PDF. We email them to you.

Get both resources