In urban areas, the noise limit that a fixed source must meet does not depend on the source but on where the receptor is located. D.S. N°14/2024 (Supreme Decree 14/2024) of the MMA (Ministerio del Medio Ambiente, Ministry of the Environment) says so in article 5: noise levels must comply with the limit “corresponding to zone I, II, III, IV or the rural zone in which the receptor is located”. So, before measuring or modelling, one question has to be answered: which zone is each receptor in?
A wrongly assigned zone is not a minor detail. Between zone I and zone IV there is a difference of 15 dBA during the day and 25 dBA at night. The decree itself acknowledges the problem: one of its changes seeks to “reduce incorrect interpretations that lead to a wrong definition of the limit to be met”.
The limits for each zone
The urban limits are the same as those set by D.S. N°38/11 (art. 6):
| Zone | Daytime (7:00 to 20:59) | Night-time (21:00 to 6:59) |
|---|---|---|
| I | 55 dBA | 45 dBA |
| II | 60 dBA | 45 dBA |
| III | 65 dBA | 50 dBA |
| IV | 70 dBA | 70 dBA |
What changes is how the zone is determined. D.S. N°14/2024 sets out, one by one, the combinations of land uses that correspond to each zone (art. 7 and tables 2 to 5).
Step 1: the land uses permitted where the receptor is located
The starting point is the IPT (Instrumento de Planificación Territorial, Territorial Planning Instrument) in force at the receptor’s location, that is, the municipal or inter-municipal zoning plan, and the land uses it permits in that zone of the plan. The decree recognises seven uses, as defined in the OGUC (Ordenanza General de Urbanismo y Construcciones, General Ordinance on Urban Planning and Construction) (art. 7):
- Residential (R)
- Public Space (EP)
- Green Area (AV)
- Facilities (E)
- Harmless Productive Activities (API)
- Infrastructure (I)
- Productive Activities (AP)
Article 8 adds four clarifications that change results:
- Facilities means all facilities, of any class and scale.
- Infrastructure means installations and buildings, not networks or routes. A power line or a sewer running through the zone does not turn it into “I”.
- Productive activities means all of them, except those expressly classified as harmless.
- Complementary uses permitted by the General Ordinance are not taken into account when applying the standard.
Step 2: the combination of uses defines the zone
With the permitted uses in hand, the combination is looked up in tables 2 to 5 of the decree. The tables are long, but they follow a logic that can be summarised as follows:
- Zone I: only residential, public space and green area uses (R, EP, AV and their combinations).
- Zone II: facilities or harmless productive activities appear (E or API), without infrastructure or productive activities.
- Zone III: residential use (R) coexists with infrastructure or productive activities (I or AP).
- Zone IV: there is infrastructure or productive activity (I or AP) and residential use is not permitted.
This summary is our reading of the tables. For a report, the zone is assigned using the exact combination in the decree’s table.
Step 3: special cases
Article 10 deals with two common situations:
- Combinations not listed in the tables, or urban areas without land use rules: the limits for zone III apply.
- A facility located within a zone IV (for example, a health centre or a school within an industrial area): the zone III limits apply to that receptor, not the zone IV limits.
Outside the urban boundary these tables do not apply: the receptor is in a rural zone and its limit depends on rural background noise (arts. 11 to 14). We explain this in our article on rural background noise.
If the zoning plan is unclear
The decree also says whom to ask (art. 9). Where further clarity is needed, the municipal Works Department (Dirección de Obras) or the Seremi de Vivienda y Urbanismo (Regional Ministerial Secretariat for Housing and Urban Development), as appropriate, states the land uses permitted by the IPT at the receptor’s location. In the event of a dispute, the Seremi de Vivienda y Urbanismo interprets the land use.
In practice, it is advisable to keep that enquiry documented in the file. A zone backed by the planning authority is harder to challenge than a zone inferred from a map.
What it means for a study in the SEIA
- The zone is assigned receptor by receptor. Two dwellings 200 metres apart may fall into different zones if a zoning plan boundary separates them.
- The IPT in force is the one that counts, not the one in place when the project was designed. An amended zoning plan may change the zone and, with it, the limit.
- The zone goes into the report with its supporting evidence: the map, the plan zone, the permitted uses and the decree table that was applied.
- A receptor on a boundary is assessed under the most demanding case until the authority’s interpretation is available.
When it applies
D.S. N°38/11 continues to apply during the transition. D.S. N°14/2024 applies from 27 August 2027 to projects entering the SEIA (Sistema de Evaluación de Impacto Ambiental, Environmental Impact Assessment System) from its publication (27 February 2026), and from 27 August 2028 to all other fixed sources. We explain this in our article on its entry into force.
A project entering the SEIA today may complete its assessment or start operating with the new standard in force. That is why it makes sense to assign zones using the D.S. N°14/2024 criteria from the baseline onwards.
How we do it
In every study we assign the zone of each receptor using the IPT in force and document it in the report, together with the map and the combination of land uses that was applied. If the zone is unclear, we say so and propose how to resolve it before measuring.
Do you have receptors in a mixed-use zone or a zoning plan under amendment? Book a 20-minute call: we will carry out a free preliminary assessment and you will receive a free technical proposal within 1 to 5 working days.

He leads Acústica Austral’s environmental noise and vibration studies for the SEIA across energy, port and infrastructure projects, and has contributed to reference work for Chile’s Ministry of the Environment.