Acoustic optimisation of wind farms

Compliance assessment by operating condition and an operating strategy for each wind turbine, from feasibility through to wind farm operation.

Continuous noise measurement tower installed in the field, facing the wind turbines of an operating wind farm.

A wind farm is always assessed against the worst case: the wind condition producing the highest noise level at the most exposed receptor, in order to obtain its Environmental Qualification Resolution (RCA), in line with the SEA’s specific guidance. That is the right way to show a project is viable. But a wind farm does not operate in its worst case: it operates across a full year, with wind speeds and directions that change hour by hour. Assessing only the worst case can lead to restricting the whole farm all year because of a condition that occurs for a few hours.

This service characterises the farm’s noise by real operating condition and, from there, defines operational strategies that meet the standard without giving up generation that was compatible with it all along. We deliver operational strategies for different wind directions and speeds, for each wind turbine, specifying the sound power level and the operating mode required, together with an estimate of the energy generated under each strategy.

Who it is for

Wind farm owners and developers: at feasibility (the design can still change), before construction (to anticipate critical conditions) or in operation (to meet commitments).

Applicable regulations

D.S. No. 38/11 MMA and D.S. No. 14/2024 MMA, which gradually replaces it.

What you receive

Compliance per operating condition and a strategy setting which mode each turbine uses and when.

More than a report: a criterion to generate as much energy as possible while complying at the receptors. Tell us the location and the turbine model.

Get a quote

How we work

  1. 1Continuous measurement

    We measure at the receptors across the full range of real wind conditions on site.

  2. 2Modelling by condition

    We model the wind farm by wind speed and direction.

  3. 3Condition-by-condition compliance

    Instead of assessing only the worst case.

  4. 4Operating strategy

    Which turbines run in reduced mode, in which wind conditions and at what times.

Head of this service line

Nicolás Bastián

Nicolás Bastián

Director of Engineering, Acústica Austral

We sign every study on behalf of the Acústica Austral team.

Technical background

This service builds on our own research presented at international congresses: noise measurement criteria for wind farms under D.S. N°14/2024, presented at the XIV Ibero-American Congress on Acoustics (FIA2026). Our list of publications also includes Variables involucradas en la optimización de un parque eólico para lograr cumplimiento normativo (2024), Recomendaciones para obtener niveles de inmisión producto del monitoreo continuo de ruido (2024) and Challenges of environmental assessment of wind farm noise in Chile: Background noise (2022).

Related service

If your farm has not yet entered the SEIA, the service you need is wind farm noise and shadow flicker studies for the SEIA. This page begins where that one ends: one assesses before the RCA, the other optimises operation.

Related projects

What the price of your study depends on

There is no fixed price: it depends on 4 factors.

Wind turbinesHow many and which model.
Receptors and measurement points
StageFeasibility, pre-construction or operation.
DeadlineDelivery earlier than the standard timeframe may change the price.

With the location, the turbine model and the deadline, we send you a technical proposal within 1 to 5 working days.

Frequently asked questions

How is this different from wind farm noise studies for the SEIA?

Studies for the SEIA assess the project before it obtains its RCA, against the worst case, to demonstrate compliance for the scenario the SEA requires in its specific guidance. This service starts from there: it takes the farm already assessed — or with the design well advanced — and looks for the best possible operation within the standard, wind condition by wind condition. One answers whether it can be built; the other, how to operate it in compliance.

Does it work if my farm is already built and operating?

Yes. It is one of the three moments when this service applies, along with the feasibility stage and the period before construction. With the farm running, the real conditions of the site can be measured rather than estimated, which is precisely what allows the operational strategy to be refined. In fact, if you are already in operation, that is the most accurate setting for the optimisation, because you can provide real data from all of your wind turbines.

Does optimising mean generating less?

That is not the aim. Assessing against the worst case can lead to restricting the whole farm all year because of a wind condition that occurs for a few hours. Defining operational strategies for different real operating conditions makes it possible to apply restrictions only when and where they are needed, and to operate without limitations the rest of the time. In our experience we have seen substantial improvements in energy generation through optimisation, meeting the standard across different conditions while also generating the greatest possible amount of energy.

How long does the continuous measurement campaign last?

Although the SEA’s 2020 guidance on applying D.S. N°38/2011 to wind farms sets a minimum of 14 days of continuous measurement, we recommend allowing at least one month per measurement point. In some cases 14 days may not yield enough data on the farm’s noise emission to reach a correlation coefficient between measured noise level and wind speed of r²≥0.6.

What information do you need to start?

We need to know whether you have continuous L90 fast measurements every 10 minutes and audio recordings covering at least 14 days, together with wind speed and direction data, energy generation and the actual operating modes of your wind turbines during the noise measurement campaign, as well as the turbine data sheets, their location and that of the receptors of interest.

What software do you use for the modelling?

We work with CadnaA for noise modelling across the different wind directions and speeds.

Request a quote

Technical proposal
We reply within 1 business day. Technical proposal within 1 to 5 business days, depending on the complexity of the request.
Request a quote for this studyBook a 20-minute call

Talk to our Head of Engineering about how we can help

Nicolás Bastián MonarcaHead of Engineering · Acoustic Civil Engineer · MSc in Acoustics and Vibration+56 9 4490 0353[email protected]

Free resources for your project

Guide to the D.S. N°14/2024 and the acoustic checklist for entering the SEIA, in PDF. We email them to you.

Get both resources