For project owners
Your project, with the noise component resolved all the way to the RCA
Noise, vibration and shadow flicker for your DIA or EIA, with a team that supports you from design through to the environmental approval.

- 900+
- projects completed
- 125
- SEIA-approved projects
- 50+
- wind farm projects completed
- 18
- government projects completed
- 40+
- scientific publications
Figures as of July 2026 · Since 2010
From design to the RCA: how we work
-
Step 1: We review your project before it is submitted.
Location, nearby receptors, noise and vibration sources, schedule. We tell you which studies the component needs and which standard it is assessed against.
-
Step 2: We measure the baseline in the field.
Measurements at the receptors. For wind farms, with continuous monitoring.
-
Step 3: We model and assess construction and operation.
If a receptor is above the limit, we propose measures and model them again until the project complies.
-
Step 4: We deliver the report for your DIA or EIA.
In PDF and Word, ready for the document, whether your own team or your consultancy puts it together.
-
Step 5: We answer the ICSARA and the Addendum.
We agree with you how to answer each observation on the component.
-
Step 6: After the RCA.
Follow-up monitoring and verification of the committed measures, when the RCA requires them.
Reference timeline: 12 to 16 weeks from the start of the baseline measurement, depending on the complexity of the project.
If you already have a consultancy
We work within their team as specialists in the noise component. If your consultancy hires us, we coordinate with them; if you hire us, we coordinate with your consultancy so that the report fits smoothly into the DIA or EIA.
Which standard your project is assessed against
D.S. No. 14/2024 (MMA) replaces D.S. No. 38/11, but not immediately. It applies from 27 August 2027 to sources of projects that entered the SEIA from 27 February 2026, and from 27 August 2028 to all other stationary sources. Until those dates, assessments are carried out under D.S. No. 38/11. If your assessment spans those dates, we review it case by case and state it explicitly in the report. Details on our D.S. No. 14/2024 page.
SEIA-approved projects, with their public record
Junquillos Wind Farm
Project owner: Colbún S.A. · Project approved.
San Antonio Outer Port
Project owner: Empresa Portuaria San Antonio · Project approved · 262 observations resolved.
Antofagasta Region Rail Transport
Empresa de Transporte Ferroviario S.A. · Approved after both studies were redone.
Open-pit iron mine (Atacama)
Project owner: Compañía Minera San Francisco S.A. · DIA approved (RCA N°143/2015).
Energy storage system (Bulnes)
Project owner: África Solar SpA · DIA approved.
Fish farm in San Pablo
Project owner: Desarrollos Acuícolas San Pablo SpA · DIA approved.
One lead per service line
- Environmental assessment (SEIA) and industrial qualification: Juan Pablo Álvarez, Managing Director.
- Wind farms (noise and shadow flicker), acoustic optimisation and noise control: Nicolás Bastián, Engineering Director.
- Compliance with the noise standard (D.S. No. 38/11 and D.S. No. 14/2024): Leonel Molina, Project Coordinator.
- Underwater noise: Fernando Salinas, Project Manager.
We sign every study on behalf of the Acústica Austral team.
Project owners who work with us
“At Mainstream we value the technical rigour and the reliability of the results delivered by Acústica Austral. Their approach — close, flexible and highly personalised service — allows them to understand the specific needs of each initiative and provide high-value solutions tailored to the challenges of our projects.”
Denisse Márquez
Environmental & Permits Leader · Mainstream Renewable Power
August 4, 2026
“We have been working with them for a year now and the service has been excellent. They stand out for their technical knowledge, commitment, proactivity, responsiveness and flexibility: everything you expect when you hire an expert consultancy.”
Bernardino Camousseigt
Environment and Permits Coordinator · Enel Green Power & Thermal Generation Chile
August 4, 2026
“Acústica Austral has been a strategic partner for AES Chile in understanding and adapting to the regulatory changes affecting environmental noise and wind farms. Their technical capability, data-driven analysis and contribution to the development of compliance criteria and protocols have enabled us to anticipate regulatory risks and strengthen the environmental management of our wind generation assets.”
Cristian Araneda
Corporate Manager, Environmental Operations and Strategy · AES Andes
August 5, 2026
Send us your project information
Attach whatever you have: layout, project description or schedule. With that we prepare the proposal without asking you again.
Get a quote for your study
- Technical proposal
- We reply within 1 working day. Technical proposal within 1 to 5 working days, depending on the complexity of the request.

Technical direction
Nicolás Bastián MonarcaHead of Engineering · Acoustic Civil Engineer · MSc in Acoustics and Vibration+56 9 4490 0353[email protected]Free resources for your project
Guide to the D.S. N°14/2024 and the acoustic checklist for entering the SEIA, in PDF. We email them to you.
Get both resources