Featured project
Noise from an open-pit iron mine for its DIA

At a glance
- Project (SEIA name)
- Explotación Mineral de Hierro Don Eduardo
- Project owner (per the SEIA)
- Compañía Minera San Francisco S.A.
- Client
- Adviser to the project owner
- Sector
- Mining
- Location
- 60 km northeast of Chañaral, Atacama Region
- Years
- 2014
- Type
- Acoustic impact assessment for the Addendum to a DIA
- Challenge
- In the ICSARA, the authority asked for an acoustic report on construction and operation, and for an assessment of truck noise in nearby settlements.
- Result
- DIA approved (RCA No. 143/2015). The report concluded that no phase exceeds the limits of D.S. No. 38/11 or those of the reference standards for trucks and blasting.
- Scale
- Crushing and magnetic separation plant of 3,960,000 t/yearAbout 1,600 ha4 receptors between 4.6 and 44.7 km from the project boundaryBlasts of up to 5,000 kg
- Instrument and status
- DIA · Approved
- Environmental approval (RCA)
- No. 143, of 5 August 2015
The challenge
The project mines iron ore in an open pit in the Atacama Desert. The nearest town is about 35 km away. The receptors that mattered were along the access road: a restaurant and a trade association at km 14 of the road to Chañaral, and a house in a fishing cove. All of them are less than 50 m from the road. During the assessment, the authority asked in the ICSARA for an acoustic report covering the construction and operation phases.
What we did
- We measured background noise by day and at night at 4 receptors (4 November 2014). One of them, an artisanal mining site where nobody stays overnight, was used only as a reference.
- We modelled the construction phase with CadnaA, using the noisiest overlap of works, and the operation phase. We assessed both against D.S. No. 38/11 of the Ministry of the Environment.
- We assessed truck and light-vehicle traffic towards the receptors with the Swiss ordinance OPB 814.41, as a reference standard under article 11 of the SEIA Regulation, because D.S. 38 does not regulate traffic.
- We assessed blasting (up to 2 a day, between 12:00 and 17:00, of up to 5,000 kg) with the Australian standard AS 2187-2.
The result
- No phase exceeds the maximum levels of D.S. No. 38/11 at the receptors assessed.
- Vehicle traffic, with an unfavourable flow, complies with OPB 814.41.
- Blasting complies with AS 2187-2.
- The DIA was approved with RCA No. 143 of 5 August 2015.
Services used in this project
Documentation
Public record of the project in the SEIA (Chile’s Environmental Impact Assessment System).
Project and project owner as stated in the public SEIA record. Acústica Austral prepared the study described here; this case does not represent the views of the project owner.