Project (SEIA name)
Piscicultura San Pablo
Project owner (per the SEIA)
Desarrollos Acuícolas San Pablo SpA
Client
Project owner; the first study, through an environmental consultancy
Sector
Aquaculture
Location
Fundo Pilmaiquén II, San Pablo, Osorno Province, Los Lagos Region
Years
2023–2024
Type
Noise impact study for the DIA, its Addenda and the responses to the authority's observations
Challenge
Generator sets and works next to a 3.4 ha amphibian habitat.
Result
Without measures, noise exceeded the reference threshold over 100% of the amphibian habitat; with the measures, we were able to rule out the potential noise impact.
Scale
2,622 tonnes per year of salmonids at harvest108 tanks (37,800 m³)
Instrument and status
DIA · Approved
Environmental approval (RCA)
No. 2025990018, of 31 March 2025, issued by the SEA Executive Directorate (interregional project)

The challenge

An open-flow fish farm on a 5.86 ha rural property, with 108 tanks and generator sets. Around it there are dwellings and habitats of importance for birds, mammals, reptiles and amphibians. The most sensitive was a 34,132 m² amphibian habitat within the project’s area of influence.

What we did

  • We measured background noise at dwellings and fauna sites, by day and by night.
  • We modelled construction (by work activity and scenario), operation and closure, with stationary sources and with project traffic.
  • We assessed the five protection objects of Article 11 of Law 19,300 with the 2019 SEA Guide: population health with D.S. No. 38/11 of the MMA; native fauna with the 2022 SEA criterion and the area of each habitat above each group’s behavioural threshold; ways of life and cultural heritage with Royal Decree 1367/2007 (the Spanish reference standard).
  • We updated the study for the Complementary Addendum and prepared the responses to the authority’s noise observations.

The result

  • Without measures, noise exceeded the amphibian reference threshold over 100% of their habitat during operation, and also during construction.
  • We proposed technical and administrative measures: hospital-grade silencers on the generator sets; machinery combinations with a maximum sound power of 112 dBA; an acoustic semi-enclosure for circular saws and the pneumatic hammer; and switching off the engines of stationary trucks.
  • With them, we were able to rule out the potential noise impact on native fauna. In terms of population health, the project remains within the limits of D.S. No. 38/11.
  • We left a noise monitoring plan for construction and operation.
  • The DIA was approved (RCA No. 2025990018, of 31 March 2025).

Services used in this project

Documentation

Public record of the project in the SEIA (Chile’s Environmental Impact Assessment System).

Project and project owner as stated in the public SEIA record. Acústica Austral prepared the study described here; this case does not represent the views of the project owner.

View SEIA record