Featured project

Noise and vibration for the DIA of a sawmill next to a wetland in La Unión

Sound level meter on a tripod beside a vegetated stream in La Unión

At a glance

Project (SEIA name)
Aserradero, secado y remanufactura de madera para exportación
Project owner (per the SEIA)
Foraction Chili SpA
Client
Environmental consultancy in charge of the DIA
Sector
Forestry industry
Location
Rural area of La Unión, Ranco Province, Los Ríos Region
Years
2023–2024
Type
Noise and vibration impact studies for the Addendum and the Complementary Addendum of a DIA, with responses to observations
Challenge
A plant operating until midnight next to a wetland with amphibians.
Result
Without measures, noise exceeded the amphibian reference threshold in part of the wetland; with administrative measures, the potential noise impact was ruled out and dwellings comply with D.S. No. 38/11.
Scale
Consumption of 128 m³ ssc/hour of logs25.28 ha, of which about 3 ha are sheds
Instrument and status
DIA · Approved
Environmental approval (RCA)
Exempt Resolution No. 20241400140, of 11 July 2024

The challenge

A sawmill, drying and wood remanufacturing plant in a rural area, operating from 8:00 to 00:00 and built in two stages, the second overlapping with the operation of the sawmill. Part of a nearby wetland, an amphibian habitat, lies within the area of influence, as do dwellings close to the work fronts for the access to Route 5.

What we did

  • We modelled eight scenarios: four for the first construction stage, three for the second (with the sawmill already operating) and full operation, by day and by night.
  • We assessed population health with D.S. No. 38/11 of the MMA; project traffic with the FTA manual (USA); and native fauna with the 2022 SEA criterion and the area of the wetland above the amphibians’ behavioural threshold.
  • In parallel we carried out the vibration study and prepared the responses to the authority’s observations.

The result

  • Without control measures, noise exceeded the amphibian reference thresholds in part of the wetland.
  • At two dwellings, construction of the access came within 2 dB of the limit, within the uncertainty of the calculation method.
  • We proposed administrative measures: a smaller dump truck next to those dwellings, zones where machinery may not exceed a sound power of 115 to 116 dBA, and switching off trucks while they are being loaded or unloaded.
  • With them, those two dwellings are at 58 dBA, 7 dB below the limit, and the potential noise impact on the wetland was ruled out.
  • The DIA was approved (Exempt Resolution No. 20241400140, of 11 July 2024).

Services used in this project

Documentation

Public record of the project in the SEIA (Chile’s Environmental Impact Assessment System).

Project and project owner as stated in the public SEIA record. Acústica Austral prepared the study described here; this case does not represent the views of the project owner.